Tennis court construction
Exalt Sports

Tennis Court
built to perform.

Tennis surfaces planned for consistent play and the climate they face.

Built for your site

A court that plays true, season after season.

Our team assesses site conditions, use patterns and delivery requirements before specifying the right system for your project.

Discuss your project
Reference guide

Tennis court dimensions,
made clear.

The playing lines are only one part of a good tennis court. The surrounding space, orientation, base construction and drainage determine how well the court performs over time.

Tennis court from above
Illustrative facility view — dimensions below are for planning reference.
Court length23.77 m

The full length for singles and doubles.

Singles width8.23 m

The inner sidelines define singles play.

Doubles width10.97 m

The full court width used for doubles.

Always confirm the final layout against the applicable rules, use case and site conditions. International Tennis Federation court guidance ↗

What we deliver

Designed around the sport.

Every detail is planned for reliable performance, safety and long-term use.

01

Site assessment

Access, drainage, dimensions and usage reviewed before design.

+
02

Technical specification

The right base, surface and accessories for your project.

+
03

Turnkey delivery

One team coordinating civil works through final handover.

+
Tennis Court FAQs

Answers before
you build.

What should be considered before building a tennis court?

Available site dimensions, ground conditions, access, drainage, usage intensity, lighting and the intended level of play all guide the right solution.

Can Exalt work on an existing Tennis Court site?

Yes. We assess the existing base, drainage, access and surrounding infrastructure before recommending whether to upgrade, resurface or build a new system.

How long does a Tennis Court project take?

Programme length depends on site conditions, weather, civil works and the final specification. A site assessment enables a realistic delivery plan.

What affects the cost of a Tennis Court project?

The main drivers are the site, base and drainage requirements, surface specification, lighting, fencing, equipment and access constraints.

How is a Tennis Court facility maintained?

Maintenance depends on the selected system and usage level. It can include cleaning, routine inspections, surface care and checks of drainage, lighting and equipment.

Start with a site assessment

Let us plan your Tennis Court project.

Share your location, site and target timeline. We will come back with a useful next step within 24 hours.

Chat on WhatsApp

CallWhatsAppGet a quote