Multi-sport court
Exalt Sports

Multi-sport Court
built to perform.

Flexible courts for basketball, tennis, volleyball and community sport.

Built for your site

More ways to play in one place.

Our team assesses site conditions, use patterns and delivery requirements before specifying the right system for your project.

Discuss your project
Reference guide

Multi-sport court planning,
made clear.

There is no single regulation layout for a multi-sport court. The best result comes from deciding the priority sports first, then resolving the markings, clear space and surface system around them.

Multi-sport court
Illustrative facility view — dimensions below are for planning reference.
Primary sportSets the footprint

Start with the sport that needs the largest playing area.

Line hierarchyDesigned for clarity

Colour and line-weight choices keep overlapping sports legible.

Run-off zoneNot optional

Allow safe clear space beyond the most demanding court.

Always confirm the final layout against the applicable rules, use case and site conditions. Site-specific planning guide ↗

What we deliver

Designed around the sport.

Every detail is planned for reliable performance, safety and long-term use.

01

Site assessment

Access, drainage, dimensions and usage reviewed before design.

+
02

Technical specification

The right base, surface and accessories for your project.

+
03

Turnkey delivery

One team coordinating civil works through final handover.

+
Multi-sport Court FAQs

Answers before
you build.

What should be considered before building a multi-sport court?

Available site dimensions, ground conditions, access, drainage, usage intensity, lighting and the intended level of play all guide the right solution.

Can Exalt work on an existing Multi-sport Court site?

Yes. We assess the existing base, drainage, access and surrounding infrastructure before recommending whether to upgrade, resurface or build a new system.

How long does a Multi-sport Court project take?

Programme length depends on site conditions, weather, civil works and the final specification. A site assessment enables a realistic delivery plan.

What affects the cost of a Multi-sport Court project?

The main drivers are the site, base and drainage requirements, surface specification, lighting, fencing, equipment and access constraints.

How is a Multi-sport Court facility maintained?

Maintenance depends on the selected system and usage level. It can include cleaning, routine inspections, surface care and checks of drainage, lighting and equipment.

Start with a site assessment

Let us plan your Multi-sport Court project.

Share your location, site and target timeline. We will come back with a useful next step within 24 hours.

Chat on WhatsApp

CallWhatsAppGet a quote